const cursor = new MouseFollower({ el: null, container: document.body, className: "mf-cursor", innerClassName: "mf-cursor-inner", textClassName: "mf-cursor-text", mediaClassName: "mf-cursor-media", mediaBoxClassName: "mf-cursor-media-box", iconSvgClassName: "mf-svgsprite", iconSvgStatePrefix: "-", iconSvgSrc: "", dataAttr: "cursor", hiddenState: "-hidden", textState: "-text", iconState: "-icon", activeState: "-active", mediaState: "-media", stateDetection: { "-pointer": "a,button", "-hidden": "iframe" }, speed: 0.55, ease: "expo.out", overwrite: true, skewing: 0, skewingText: 2, skewingIcon: 2, skewingMedia: 2, skewingDelta: 0.001, skewingDeltaMax: 0.15, stickDelta: 0.15, showTimeout: 20, showOnEnter: true, hideOnLeave: true, hideTimeout: 300, hideMediaTimeout: 300, initialPos: [-window.innerWidth, -window.innerHeight], }); const cursor = new MouseFollower({ el: null, container: document.body, className: "mf-cursor", innerClassName: "mf-cursor-inner", textClassName: "mf-cursor-text", mediaClassName: "mf-cursor-media", mediaBoxClassName: "mf-cursor-media-box", iconSvgClassName: "mf-svgsprite", iconSvgStatePrefix: "-", iconSvgSrc: "", dataAttr: "cursor", hiddenState: "-hidden", textState: "-text", iconState: "-icon", activeState: "-active", mediaState: "-media", stateDetection: { "-pointer": "a,button", "-hidden": "iframe" }, speed: 0.55, ease: "expo.out", overwrite: true, skewing: 0, skewingText: 2, skewingIcon: 2, skewingMedia: 2, skewingDelta: 0.001, skewingDeltaMax: 0.15, stickDelta: 0.15, showTimeout: 20, showOnEnter: true, hideOnLeave: true, hideTimeout: 300, hideMediaTimeout: 300, initialPos: [-window.innerWidth, -window.innerHeight], });
top of page
Search

The Hidden Challenges of Building an ADU in California (Even With New Laws)

  • TCS Hello
  • May 9
  • 13 min read


New State Laws Simplify the Approval Process

Over the past decade, California has passed a series of state laws designed to streamline the approval process for accessory dwelling units (ADUs). These legislative efforts were a direct response to the state’s ongoing housing shortage, and they aim to make it easier for homeowners to add housing units on their property without being blocked by local zoning restrictions.

The changes began with Senate Bill 1069, which went into effect in 2017. This law prohibited local jurisdictions from requiring parking for ADUs within a half-mile of public transit and reduced or eliminated utility connection fees under certain conditions. It also removed the requirement that ADUs must be built on owner-occupied properties.

In 2020, Assembly Bill 68 and Assembly Bill 881 expanded these reforms. AB 68 required cities to approve ADU applications through a ministerial process, meaning approvals must be based on objective standards only and cannot be subject to public hearings or discretionary review. Both AB 68 and AB 881 also limited local governments' ability to set minimum lot sizes or impose development standards that effectively prohibit ADUs on otherwise eligible lots.

Senate Bill 897, enacted in 2023, built on previous legislation by increasing the maximum allowable height for detached ADUs and clarifying that cities cannot require replacement parking when a garage is converted into an ADU. The law also made it easier to build multiple ADUs on the same lot in certain cases, such as duplex or multifamily properties.

Additionally, Assembly Bill 2221, also signed in 2022, further clarified how cities must interpret and apply state ADU standards. It reaffirmed the requirement for cities to approve or deny ADU applications within 60 days and clarified that delays due to agency coordination do not justify missing that deadline [4].

Taken together, these laws have significantly simplified the entitlement process. In most cases, qualifying ADU projects are now protected by state law, reviewed through a streamlined process, and approved based solely on clear, pre-defined development standards. These reforms have made it legally easier to move forward with an ADU, especially in cities where local zoning had previously made it nearly impossible.

However, while these laws address zoning and entitlement barriers, they do not eliminate the physical, financial, or procedural challenges that may arise during design, permitting, or construction. That distinction is essential for anyone considering an ADU project.

The Policy Shift

California’s accessory dwelling unit (ADU) laws have undergone a series of major reforms over the past several years. These changes are part of a broader effort to address the state’s housing shortage by removing local regulatory barriers and encouraging the development of small-scale housing on residential lots.

The shift began with Senate Bill 1069, which took effect in 2017. This legislation limited the ability of local governments to impose off-street parking requirements for ADUs, particularly when the unit is located near public transit. It also restricted utility connection fees and clarified that ADUs could be developed on any lot with an existing residential use, regardless of lot size or zoning.

In 2020, the state enacted Assembly Bill 68 and Assembly Bill 881, which together required local jurisdictions to approve ADUs through a ministerial process. Under these laws, cities must review ADU applications using objective standards and respond within 60 days. The legislation also eliminated minimum lot size requirements, reduced required side and rear yard setbacks to four feet, and allowed for both an ADU and a junior ADU on the same parcel.

Reforms continued in 2022 with SB 897 and AB 2221. These laws further limited local discretion and clarified aspects of the ADU process, such as allowable height limits and eligibility for detached ADUs on multifamily properties. Importantly, they reinforced that cities must follow state law and cannot apply vague or subjective criteria to delay or deny compliant applications.

Together, these legislative changes have shaped a more permissive environment for ADUs. The intent has been clear: simplify approval, eliminate unnecessary red tape, and enable more housing options in areas already developed with residential uses.

As a result, there is now a widespread perception that ADUs are fast and easy to build. Public messaging, planning department handbooks, and media coverage often frame ADUs as an accessible and cost-effective way for homeowners to add space, generate rental income, or support multigenerational living.

However, that perception does not always reflect reality. While the laws have removed many entitlement barriers, they do not resolve challenges related to financing, construction feasibility, or local implementation practices. These issues remain critical to the success or failure of individual ADU projects.


Source:

The Hidden Challenges of Building an ADU

California’s ADU legislation has made it easier to gain approval for new units, but entitlement alone does not guarantee feasibility. Many of the underlying challenges that affect whether a project can be built have not been resolved by state policy. Issues related to financing, construction costs, and physical site conditions continue to shape outcomes on a parcel-by-parcel basis.


Financing Is Still a Barrier

Securing funding remains one of the most common obstacles for homeowners pursuing an ADU. Traditional mortgage products are not always well-suited for this type of construction, particularly when the unit is detached or intended for rental income. According to Freddie Mac, many homeowners rely on home equity lines of credit, cash-out refinancing, or renovation loans. Each of these options comes with credit, equity, and income requirements that not all applicants meet.

While specialized ADU financing programs are emerging, they are still limited in scope and often unavailable in smaller markets. Without a reliable or accessible source of funding, many projects never advance beyond the planning stage.

Construction Costs Are Higher Than Expected

ADUs are often framed as an affordable housing solution, but that description does not always reflect the actual cost to build one. Detached ADUs frequently exceed $300,000 in total development costs, depending on site conditions, labor rates, material choices, and finish level. Some projects reach or surpass $400,000, particularly when site work, utility trenching, or retaining walls are required.

Fixed costs such as permitting, design, and utility connections do not scale down with the size of the unit. As a result, the cost per square foot for an ADU is often higher than for a larger single-family home. In markets with moderate rental income or flat resale value, the return on investment can be difficult to justify.

For many homeowners, the disconnect between policy messaging and real construction costs can come as a surprise. While the state has removed some entitlement and design hurdles, building an ADU remains a significant financial commitment that requires a clear plan and realistic budget.


Source:


Physical and Site Constraints Still Matter

While state law sets the stage for ADU approval, real feasibility is often determined by the physical conditions of the property. A site may be legally eligible for an ADU, but that does not mean it can support one without added cost, complexity, or design limitations.

Factors such as steep slopes, unusual lot shapes, or proximity to existing structures can make it difficult to meet minimum setback or height requirements. In some cases, retaining walls or special grading plans may be required to make the site buildable. Soil stability, drainage, and flood risk may also trigger additional permitting steps or construction precautions.

Utility placement is another common concern. Sewer lines, water mains, and electrical connections may not be located near the proposed unit. Extending or relocating these services can add time, require coordination with outside agencies, and significantly increase costs. These site conditions are not always visible during an initial desktop review, but they often determine whether the project is feasible once engineering or plan review begins.

Design and Access Requirements Are Often Overlooked

In addition to physical conditions, most ADUs are subject to building and fire code standards that influence layout and placement. One of the most commonly overlooked issues is emergency access. Fire departments typically require a continuous, unobstructed path of travel from the public right-of-way to the ADU. On narrow or flag-shaped lots, meeting this requirement can be difficult and may result in redesign or even disqualification.

Local design standards can also influence what is allowed. Some jurisdictions require detached ADUs to match the architectural style or roof pitch of the main dwelling. Others impose privacy requirements, limit window placement, or restrict where second-story units can be located. These rules, while permitted under state law as long as they are objective and clearly written, often introduce unexpected complexity.

Basic requirements like daylighting, ventilation, and egress must also be addressed. On small or irregular lots, complying with these standards may reduce the usable floor area or force compromises in the unit’s layout.

Together, these physical and regulatory factors can limit what is possible, even when zoning allows the use in principle. For any project to move forward successfully, these constraints must be understood and accounted for at the outset.

The Local Layer Still Matters

Although California’s ADU laws were written to limit local barriers, cities and counties still retain significant control over how these laws are implemented. The result is that a project that qualifies under state law may still encounter delays, added costs, or design restrictions depending on how a particular jurisdiction applies its own standards.

Local Interpretation of State Law

State legislation requires most ADUs to be approved through a ministerial process, which means decisions must be based on objective criteria without discretionary review. However, what counts as “objective” can vary from one city to the next. Local agencies may apply their own interpretations to height limits, setbacks, lot coverage, or access requirements. In practice, some cities have adopted ordinances that closely follow state law, while others have preserved legacy restrictions that limit what is buildable.

For example, terms like “compatible with the existing structure” or “neighborhood character” are still present in some local codes. These phrases introduce room for subjective review, even when a project technically qualifies for ministerial processing.

This variation can affect how long the review takes, whether plans require redesign, and whether additional approvals are needed before a permit can be issued.

Added Design, Utility, and Fire Requirements

Some jurisdictions impose requirements that go beyond what state law mandates. These can include specific design criteria such as roof pitch, exterior materials, or window placement. Others enforce minimum separation distances between structures or require architectural compatibility with the primary dwelling.

In hillside areas or zones designated as high fire risk, additional access, turning radius, or clearance requirements may apply. Local fire departments may require that a driveway be widened or that a fire hydrant be located within a specific distance of the ADU. Utility providers may also require service line separation, trenching, or metering changes that were not anticipated during early planning.

Even if a project appears to meet state standards, these added local conditions can significantly change the scope, cost, or layout of the ADU.

Timelines, Fees, and Inspections Vary Widely

Although California law requires cities to approve ADU applications within 60 days if the application is complete, some jurisdictions struggle to meet this timeline. Review times can be extended by coordination with other departments, such as public works, utilities, or fire. In some cities, planning departments require multiple rounds of revisions, even when comments involve relatively minor clarifications.

Permit fees and utility connection charges also vary, sometimes by thousands of dollars between jurisdictions. Inspection requirements may include additional site visits or agency approvals beyond what the applicant initially expected.

Understanding how a city processes ADU applications in practice—not just in writing—is essential for anyone planning a project.

How to Evaluate a Site for ADU Feasibility

State law may grant the right to build an accessory dwelling unit, but that right does not guarantee a site is ready for development. A successful ADU project depends on much more than zoning compliance. It requires a clear understanding of the property's physical characteristics, local development standards, and infrastructure limitations. Without this early evaluation, even a permitted project can face delays, unexpected costs, or design changes that affect its viability.

Zoning Review

California law prohibits cities from using minimum lot size requirements or certain setback rules to block ADUs. However, local zoning codes still govern aspects of the project such as allowable building height, total lot coverage, and floor area ratio. Some jurisdictions also impose restrictions through specific plans, hillside regulations, or historic preservation overlays.

Before beginning design work, confirm the zoning classification of the parcel and determine whether the site qualifies for a detached ADU, an attached unit, or a junior ADU. Each comes with different development standards and size limits. While many cities provide online zoning maps or ADU handbooks, it is best to verify these details through the local planning department or a formal zoning verification letter.

This review will help identify whether the unit must meet additional design criteria, whether variances may be required, and whether there are any local conditions that restrict building on the parcel.

Utility Access

Every ADU must connect to essential services, including water, sewer, electricity, and sometimes gas. In some jurisdictions, ADUs may be allowed to share utility connections with the primary dwelling. In others, utility agencies may require separate meters or upgrades to existing service lines based on demand or safety requirements.

Older neighborhoods often have infrastructure that was not designed to support additional housing. For example, a sewer lateral may be undersized, or an electrical panel may not have the capacity to support another unit. These issues can add thousands of dollars in construction cost and require trenching or coordination with multiple agencies.

Evaluating utility capacity early is critical. Start by identifying the location of the existing utility lines and whether service upgrades are likely. Contact local utility providers to determine if there are connection fees or capacity constraints. Doing this work before submitting plans can help you avoid major delays during plan check and ensure that the site is technically capable of supporting the ADU.

Timelines, Fees, and Inspections Vary Widely

While California law requires local agencies to approve qualifying ADU applications within 60 days of submission, the actual review process often takes longer. Differences in staffing levels, internal procedures, and coordination with other departments can significantly influence how long it takes to move from submittal to permit issuance.

Some cities have established efficient systems with clear checklists, objective standards, and well-defined timelines. These jurisdictions are generally able to process applications on schedule and provide predictable review cycles. Others may lack internal coordination or depend on reviews from multiple departments, such as fire, public works, and utilities, which can lead to additional delays.

In practice, it is not uncommon for cities to request multiple rounds of plan revisions, even for relatively minor clarifications. These delays are not always violations of the 60-day requirement, particularly if the city deems the application incomplete or if resubmittals are treated as new filings.

Permit fees and utility connection charges also vary widely between jurisdictions. Some cities charge flat rates based on square footage, while others assess fees based on valuation, impact, or infrastructure needs. Inspection protocols differ as well. A project may require inspections from planning, building, public works, and fire departments, depending on the site and scope of the work.

Given these variables, it is difficult to estimate approval timelines and total costs without jurisdiction-specific research. Even within the same county, timelines and processes can vary substantially from one city to the next.

Understanding how a particular city applies state law, how its staff interprets technical requirements, and how departments coordinate is critical to effective planning. Early conversations with local professionals, including architects or permit specialists familiar with the area, can provide insight into the likely timeline and any hidden hurdles.

For anyone considering an ADU project, this local insight is just as important as understanding state policy. It helps set realistic expectations and can prevent costly delays or redesigns down the line.


How to Evaluate a Site for ADU Feasibility

California law has made it easier to entitle accessory dwelling units, but entitlement does not guarantee that a site is ready for development. A successful ADU project depends on a clear understanding of the physical property, local zoning, infrastructure conditions, and permitting process. Without this early evaluation, project costs, delays, or compliance issues can arise after significant time and capital have already been invested.

Zoning Review

Even with statewide ADU protections in place, local zoning codes still influence how an ADU can be designed and where it can be built. Lot coverage limits, setback requirements, and height restrictions vary by jurisdiction and must be confirmed at the parcel level. Some properties may also fall under special planning areas such as hillside zones, coastal overlays, or historic districts, each of which may introduce additional limitations.

It is also important to determine whether the property is eligible for a detached ADU, an attached unit, or a junior ADU. These categories are defined separately under state law and have different development standards. Cities may publish summary handbooks, but a formal zoning verification or conversation with the planning department can provide the most up-to-date information.

Utility Access

ADUs must connect to water, sewer, electric, and often gas. These connections can be more complex than anticipated, particularly on older lots or those located far from utility mains. Some jurisdictions allow shared services between the main dwelling and the ADU, while others may require separate metering or upgrades to existing systems.

Trenching for utilities across a long or obstructed lot can add significant cost. In some cases, service lines may need to be rerouted to meet code. Early coordination with utility providers helps identify potential issues and avoids surprises during permitting or construction.


Site Layout and Access

The physical layout of the property can affect ADU placement, design, and buildability. Narrow side yards, limited rear yard space, or steep slopes can constrain where the unit can go. Fire departments often require a clear path of travel from the street to the unit, usually a minimum of 3 to 4 feet wide. If that access cannot be provided, the unit may need to be redesigned or may not be permitted.

Construction logistics should also be considered. Excavation equipment, prefabricated units, or building materials need a clear access route. Properties with limited space may require more labor-intensive construction methods, which can increase cost and duration.


Cost and Return Analysis

Construction costs for ADUs in California can range widely, often falling between $250 and $400 per square foot. Site-specific conditions such as grading, utility trenching, or retaining walls can add to the base construction budget. In addition to hard costs, soft costs like design, permitting, and inspections must be included in any financial assessment.

A project should be evaluated not just for feasibility, but also for financial performance. Compare total development costs to potential rental income or increased resale value. If the return does not justify the investment, consider scaling back the scope or reassessing project timing.

Permitting and Local Review Timelines

Although California law requires cities to approve complete ADU applications within 60 days, not all jurisdictions meet this standard. Delays often occur when multiple departments are involved, such as public works, fire, or utilities. In some cities, planning departments require multiple rounds of revisions, which can push approval timelines well beyond what state law anticipates.

It is important to understand how your local city or county handles ADU applications in practice. Speaking with local architects, builders, or permitting consultants can help establish realistic expectations for review timelines, fees, and required submittals.


Final Thoughts

Accessory dwelling units remain one of the most flexible tools for adding housing to existing neighborhoods. They can provide long-term rental income, accommodate extended family, or improve property value. From a policy perspective, ADUs offer a way to increase housing supply without requiring large-scale rezoning or new infrastructure.


However, they are not a turnkey solution.


Despite statewide reforms, building an ADU still requires careful analysis and informed decision-making. Many projects are delayed or derailed not because of zoning restrictions, but because of site-specific issues, unclear local processes, or underestimated costs. The entitlement may be in place, but that does not mean the project is financially viable or technically feasible.


Some of the most common setbacks arise from assumptions. Just because a property qualifies under state law does not mean it can support an ADU without added engineering, design revisions, or utility upgrades. Setbacks, access paths, slope, and service capacity can all affect whether the unit can be built at all, or whether it can be built cost-effectively.


If you are considering an ADU, the most important step is to gather detailed information before moving forward. Confirm zoning, overlays, and fire access. Assess utility availability and trenching requirements. Review permitting timelines in your jurisdiction. Talk to professionals who understand the local process and can provide realistic feedback about costs and sequencing.


Ultimately, success comes from early planning, not just eligibility. The best ADU projects are those where entitlement, feasibility, and execution align. The goal is not just to be allowed to build, but to complete a project that delivers value on the ground and meets your goals without surprises.


 
 
 

Comments


bottom of page
const cursor = new MouseFollower({ el: null, container: document.body, className: "mf-cursor", innerClassName: "mf-cursor-inner", textClassName: "mf-cursor-text", mediaClassName: "mf-cursor-media", mediaBoxClassName: "mf-cursor-media-box", iconSvgClassName: "mf-svgsprite", iconSvgStatePrefix: "-", iconSvgSrc: "", dataAttr: "cursor", hiddenState: "-hidden", textState: "-text", iconState: "-icon", activeState: "-active", mediaState: "-media", stateDetection: { "-pointer": "a,button", "-hidden": "iframe" }, speed: 0.55, ease: "expo.out", overwrite: true, skewing: 0, skewingText: 2, skewingIcon: 2, skewingMedia: 2, skewingDelta: 0.001, skewingDeltaMax: 0.15, stickDelta: 0.15, showTimeout: 20, showOnEnter: true, hideOnLeave: true, hideTimeout: 300, hideMediaTimeout: 300, initialPos: [-window.innerWidth, -window.innerHeight], });