Garage Conversion vs. Detached ADU - What’s the Difference?
- TCS Hello
- Jun 12
- 5 min read

Accessory Dwelling Units (ADUs) continue to gain popularity in Los Angeles for good reason. They can increase property value, generate rental income, and add much-needed living space. With new state laws making ADUs easier to permit, more homeowners are exploring the possibilities.
But one of the first and most important decisions to make is whether to convert an existing garage or construct a new detached unit. While both are legally supported under California ADU law, they involve different permitting processes, timelines, and long-term outcomes.
This guide walks through the key distinctions, focusing on cost, zoning, permitting complexity, and site constraints so you can make an informed choice before investing in design or submitting plans.
Section 1: Cost Comparison – What You’ll Spend and Why
Garage Conversion
Garage conversions typically range from $95,000 to $135,000 in Los Angeles. These projects can be cost-effective because they reuse an existing structure. If the slab, walls, and framing are in decent shape, you may avoid major foundation or framing costs.
However, many garages were built before current code standards. Common problems include:
Cracked or unreinforced slabs
Insufficient ceiling height
Unpermitted modifications
Outdated electrical systems
These conditions may require substantial upgrades to bring the structure into compliance. According to the California HCD’s 2022 ADU Handbook, conversions are usually exempt from parking replacement if within a half-mile of public transit. That said, LADBS still reviews each property individually.
Detached ADU
Detached ADUs involve full ground-up construction, with typical costs ranging from $180,000 to $300,000 or more, depending on site conditions and finishes. The higher cost reflects the need for:
New foundations
Utility trenching
Framing, roofing, insulation, and finishes
Title 24 energy compliance
The California Residential Cost Guide places most new detached ADUs between $300 and $400 per square foot, though hillside lots or higher-end finishes may push those numbers higher.
Detached units allow for larger square footage, better privacy, and layout flexibility, but they also come with more permitting layers.
Section 2: Permitting, Zoning, and Fire Access
Garage Conversion Pros

In Los Angeles, garage conversions are generally more straightforward to permit. They often qualify for:
Setback exemptions, since the structure already exists
No parking replacement, if located within 0.5 miles of transit (per Gov Code §65852.2)
Shorter plan check timelines, since design is limited to existing footprint
Because the structure is already permitted and within the existing development envelope, LADBS review typically focuses on:
Structural integrity
Habitability
Energy code upgrades
Legal status of the original garage
Detached ADU Watchouts
Detached ADUs are subject to full zoning review. That includes setbacks, fire access, and separation from the primary dwelling. Under Fire Code Section 503.1.1, the unit must have a 3- to 4-foot wide, unobstructed path from the street to the entrance.
Detached units must meet:
Minimum 4-foot setbacks from rear and side lot lines
6 feet of building separation from the primary residence (per Title 24)
Zoning overlays (such as Specific Plan Areas, hillside zones, or Historic Preservation Overlay Zones)
Without a clear fire access path, or if the build area is obstructed by utility lines or easements, plan check may require redesign.
Section 3: Common Permitting Pitfalls

Even straightforward projects can run into delays if the site isn’t evaluated early. These are some of the most common permitting issues TAPS sees:
Easements: Utility or drainage easements can restrict where you can build. These are not always visible on assessor maps and require a title report or survey.
Noncompliant Garages: If a garage is unpermitted or structurally unsound, LADBS may require demolition and rebuild.
Fire Access Conflicts: Narrow side yards or obstructions can prevent detached units from meeting access code.
Parking Replacement Requirements: Properties outside of transit zones or within Specific Plan boundaries may still trigger parking replacement for garage conversions.
🛠 Tip: Always start with a zoning check and parcel-specific code review before beginning design work.
Section 4: Design Flexibility, Privacy, and Livability

Garage Conversions
Garage conversions are usually limited to 300–400 square feet. They can often be completed in 3 to 5 months and are ideal for studios or compact one-bedroom layouts. These units are best suited for short-term stays, guest quarters, or modest rental income.
Design constraints include:
Limited natural light
Proximity to driveways or side yards
Sound transmission from the main home
With thoughtful design, garage ADUs can be livable and attractive, but they may not offer the privacy or layout flexibility some tenants or family members need.

Detached ADUs
Detached units are far more customizable. They support:
Larger footprints (500–850 square feet or more)
Open layouts and multi-bedroom options
Natural light through window placement and outdoor integration
These are ideal for long-term tenants, extended family, or work-from-home setups. Detached ADUs also tend to increase resale value more significantly than garage conversions, especially if metered and permitted independently.
Section 5: Rental Income and Return on Investment

Garage Conversions
Garage ADUs typically rent for $1,800 to $2,400 per month, depending on neighborhood, unit size, and finishes. According to May 2025 data from Apartments.com and Zillow:
West Adams and El Sereno: frequently over $2,000/month
North Hollywood: strong mid-range rental demand
These units generally recoup costs in 4 to 6 years, particularly when financed through a HELOC or paired with the CalHFA $40,000 predevelopment grant.
Detached ADUs
Detached ADUs rent for $2,400 to $3,800 per month, with some units exceeding $4,000 in Culver City or Westwood. While they cost more to build, they offer higher rents, stronger tenant retention, and better long-term equity.
ADU Type | Build Cost | Rent Range | Annual Income | Payback Period |
Garage Conversion | $95K – $135K | $1,800 – $2,400 | $21,600 – $28,800 | 4–6 years |
Detached Studio | $140K – $180K | $2,000 – $2,700 | $24,000 – $32,400 | 5–7 years |
Detached 1-Bedroom | $180K – $230K | $2,400 – $3,200 | $28,800 – $38,400 | 5.5–8 years |
Detached 2-Bedroom | $240K – $300K | $3,000 – $3,800 | $36,000 – $45,600 | 6.5–8.5 years |
Figures reflect gross rents. Net ROI will depend on taxes, financing, and vacancy.
Section 6: Which Option Fits Your Lot?

Choose a Garage Conversion If:
You have a legal, structurally sound garage
Your lot has limited buildable area or narrow access
You want a cost-effective ADU with a short timeline
You plan to house guests, students, or short-term tenants
Choose a Detached ADU If:
Your lot meets fire access and setback rules
You want more square footage and privacy
Your long-term goal is rental income or multigenerational living
You have flexibility in budget and build timeline

Final Thoughts
There is no universal answer when choosing between a garage conversion and a detached ADU. Each path comes with different tradeoffs in cost, code compliance, and long-term value.
Garage conversions are efficient and affordable, but limited in space. Detached units are more complex to permit and build, but offer stronger returns and livability. The right answer depends on your lot, your goals, and what Los Angeles zoning and fire code will allow. Before committing to design or financing, a site-specific feasibility review is the best way to move forward confidently. It can reveal code barriers early and ensure your ADU is not only buildable, but also approvable. If you're planning an ADU in Los Angeles, start with clarity start with the code.